Afghanistan · Sep 2025 – Jul 2026
Badakhshan placer gold
As Technical Director – Mining at Jaihoon I ran placer-gold operations across projects in the mountains of Badakhshan. Placer mining lives or dies on water: much of the engineering was planning how to capture and convey it, and adapting a staged transfer layout when pipe sizes set the limits.
Away from site I built a source-checked dataset of more than 40 mineral occurrences and an exploratory Placer Suitability Index in Python and QGIS. That's how I use AI: to organise the evidence before drawing a conclusion.
Nigeria · Aug 2019 – Jun 2020
Ashaka: two remote operations
As Project Manager for PW Mining International I led two remote mining operations around Ashaka in Gombe State, one with more than 150 people, almost all hired locally and upskilled to British standards. I brought in preventative maintenance and delivered the repaving of 100+ km of the Ashaka–Gombe highway.
Ashaka taught me that access to an orebody is a negotiation before it's ever an engineering problem. When our mining advance reached farmland inside the site boundary, it became a genuine negotiation with the local tribal authority, closed by agreement.